Electric Vehicle Charging Program

Eligibility Criteria 
  1. New EV charger must be installed on cooperative's lines. 
  2. Incentive not to exceed the EV charger cost. 
  3. Incentives are in place through December 18, 2026. Funds are limited so submit required documentation as soon as possible. 
  4. Required documentation must be submitted within 3 months of EV charge install date. 
  5. Additional eligibility criteria may apply. Program is subject to change or cancellation without notice. Contact cooperative for details. 
  6. Required Documentation: 
    1. A copy of your receipt or invoice for each item with purchase price(s) and install date circled. 
    2. Proof of installation
  7. If all required information AND documentation are not provided, rebate will be rejected
Once application has been approved, member will receive a $500 rebate per charger. 

By submitting this form, it will automatically be sent to Riverland Energy. 
Applicant Information











Service Location Information




Scheduling with Member Services
Must be on load control or Time Of Use rate as defined by the cooperative to receive the rebate. 

A representative from Member Services will be reaching out to schedule an appointment for installation of the radio receiver. 




Electric Vehicle Charging Equipment





Documents



By typing my name above, I understand and agree that this form of electronic signature has the same legal force and effect as a manual signature. By the undersigned Contractor's signature, the Contractor/Applicant, acknowledges and agrees that the information that has been provided above is correct and the equipment has been installed.