Legal Descriptions - Provide one of the following documents
- Recorded Warranty Deed
- Title Report
- Quit Claim Deed
- Real Estate Contract
Mapping - Provide one of the following documents
- Assessors Map
- Survey
- Short Plat
Site Plan - Include all of the following that are applicable
- All Buildings
- Driveway
- Well
- Septic System
- Retaining Walls
- Fences
- Landscaping
- Future Buildings
- Proposed meter and/or transformer location
Service Address obtained from local government agency
Note: any deviation from the electrical design, once established, may result in additional costs for redesign, and construction may be delayed. It is the customer’s responsibility to provide all the necessary PUD requirements and specifications to the subcontractor.
If the original easement documents haven’t been returned with notarized signatures of all parties, your job will not be released for construction until they are received. This could cause long delays in the construction process.
Initial Application Fee – Non-Refundable
$100 - Modification
$200 – Residential
$200 – Per Unit with a max of $3,000
$200 – Commercial
The final step of this application is payment of the application fee (applied toward job cost) and signing our terms and conditions, which is required before the application can be submitted. We accept major credit cards, including Visa, Mastercard, and Discover.
Distributed Generation Addition (solar, wind, hydro) requires a separate application and fee.
Click here - Solar Link