INTERCONNECTION REQUEST
(APPLICATION)


Processing Fee
A non-refundable processing fee of $100 must be paid before this Application is considered complete. 



This will determine who will receive an email with a link to pay the required fee.
Interconnection Member Information










Contractor Information










Distributed Generation Facility Information

The location where the Generator (or Panel) will be installed.





(kW)
Generator or Panel



IEEE or UL certification

(AC Volts)

(kW)
Inverter



IEEE or UL certification


(kW)
Battery


IEEE or UL certification

(kWh)

(kW)
Disconnect Switch



IEEE or UL certification

(AC Amps)
Attach Supporting Documents





Terms and Conditions
I hereby certify that, to the best of my knowledge, the information provided in this
Application is true. I agree to provide any further information required during the
Interconnection Application Process and to install and operate the interconnecting
equipment according to the Terms and Conditions as outlined in Jackson Electric
Membership Corporation’s Distribution Interconnection Procedure.