C&I EV Level 2 Smart Charging Station Incentive Application

| Resume a previously saved form
Resume Later

In order to be able to resume this form later, please enter your email and choose a password.

Password must contain the following:
  • 12 Characters
  • 1 Uppercase letter
  • 1 Lowercase letter
  • 1 Number
  • 1 Special character

SECTION 1: Utility Member Information

(as it appears on electric utility bill)




SECTION 2: Job Site Information


(first and last name)


Enter your 10-digit phone number without the dashes.

Enter your 10-digit phone number without the dashes.


(where equipment is installed)




(found on monthly bill)

MM-DD-YYYY



SECTION 3: Trade Ally (Contractor) Information









Section 4: Electrical Contactor Information












SECTION 5: Payee and Mailing Address

(By checking Landlord or Trade Ally, member is authorizing payment to the third party indicated. See Third-Party Payees section of Terms and Conditions for details.)





SECTION 6: Payee IRS Form W-9 Information


The Internal Revenue Service does not require your consent to any provision of this document other than the certifications required to avoid backup withholding. Attach the payee’s IRS Form W-9 below

General Requirements

  • 2025 installs only. Any receipt or invoice showing a 2026 install date will be denied.
  • Charging station must be permanently (hardwire) installed at a business location served by a Great Lakes Energy electric account with a general service or large power rate code.
  • Licensed Michigan electrician contractor installation required.
    • You cannot perform the verification yourself, even if you do the installation. You are responsible for payment to the contractor if a service call is needed.
  • Charging station must be available to the public or used for private fleet vehicle charging.
  • $1,000 rebate is per charging station. A single charging station may have more than one charging port.
  • Maximum of four charging stations are eligible for rebate.
  • Must be a Level 2 (208/240 volt) or DC fast charger to qualify.
  • Member must commit to providing a dedicated parking space for each charge port installed.
  • Charging station must be listed by a Nationally Recognized Testing Laboratory such as UL, ETL, or CSA.
  • Equipment must be new (used equipment is not allowed).
  • Rebate may not exceed 75% of the total project cost.

Commercial EV Charging Station Rebate
$1,000 per charging station (limit of 4 ports)







Member Signature