Egyptian Electric Cooperative Association is the governing
body for interconnection within our territory. The Engineering & Operations
Department may require more than is listed if deemed necessary by site.
Please allow 1-2 weeks from the time your contractor has
completed the system installation, and notified EECA, for the engineering and
metering department to coordinate and set-up the inspection. After inspection
and approval, the meters will be installed.
Prior to any interconnection activity, installers will need
approval from the EECA Engineering Department. This is to verify the
interconnection will be approved and to verify that no additional equipment
and/or service upgrade is needed by the EECA member.
NOTE: Egyptian Electric Cooperative Association reserves the
right, at any time, to amend any part of this guideline/policy including,
without limitation, the type, amount or application of any Distribution and
Transmission Charges, penalties or rebates set out in this guideline. This
guideline is intended as a summary only and is not intended to be a statement
of Egyptian Electric’s rights and obligations in relation to distributed
generation.