This application form must be completed and the application fee of $375.00 (three hundred seventy-five dollars) paid prior to any construction work or engineering design work being performed by Paulding Putnam Electric Cooperative (Paulding Putnam).
Qualifying facility shall be no larger than 80% of the previous three (3) year 12-month average energy use for all predictable loads. Non-predictable loads will be determined on a case-by-case basis.