APPLICATION FOR INTERCONNECTION AND PARALLEL OPERATION








This application form must be completed and the application fee of $375.00 (three hundred seventy-five dollars) paid prior to any construction work or engineering design work being performed by Paulding Putnam Electric Cooperative (Paulding Putnam).


Qualifying facility shall be no larger than 80% of the previous three (3) year 12-month average energy use for all predictable loads. Non-predictable loads will be determined on a case-by-case basis.

Customer Information












Service Point Address Information





Mailing Address




Notes:

The following information shall be supplied by the Member or Member's designated representative. All applicable items must be accurately completed so that the Member's generating facilities may be effectively evaluated for interconnection with Paulding Putnam's Distribution System.

GENERATOR Information












Notes:

Any cogeneration interconnection to Paulding Putnam's system shall be on the appropriate net billing rate schedule designed for cogeneration or distribution generation as determined by Paulding Putnam. Cogeneration shall not be combined with any other rate schedule.

Power Export Information






Required Documentation and Approvals

Important:

If marked as required, the correct file must be uploaded for the application to be considered complete.



Note: Requires a Yes for an Application to be considered complete.

Note: If yes, documents must be uploaded to this application.



Note: If yes, documents must be uploaded to this application.


Terms and Conditions
Click this link to read the Terms and Conditions. The online pdf can be downloaded and stored for your records.