GVEC Qualifying Renewable Generating Application



Member/Applicant Information









Physical Address Information





Mailing Address information




Renewable Energy Dealer/Contractor










PV System Information 







Battery Information









*Provide maximum battery system Charging Input and Discharging Output based factors such default system controller settings or other identified limiting factors that will limit actual charge/discharge (kW) of the system. This information is used to evaluate transformer capacity and calculate applicable rebates. 

Terms & Conditions

The Member/Contractor acknowledges that:
  • A signed Interconnection Agreement and one-line wire diagram are included with this application. 
  • The contractor shall abide by local permitting and inspection regulations.
  • The installation follows Appendix A of the signed Interconnection Agreement.
    • Equipment must be installed outside of the utility easement.
    • The Installation was designed and installed by a licensed contractor following current National Electric Code (NEC).
    • The design includes dedicated monitoring meter socket(s), installed by the licensed contractor.
    • The Installation is equipped with a manual, lockable disconnect installed between the Member's Installation and the GVEC electric power distribution system which should always be maintained and in good working order.
    • The Member is NOT allowed to install a “meter collar style” transfer switch or any device that would exist between GVEC’s service meter used to measure electrical energy sold to the Member and the Point of Delivery inside of the meter base at the Member’s service.
  • GVEC will provide and install the revenue and monitoring meters referenced in Appendix A. 
  • The Member agrees to sell GVEC any excess energy produced by the Installation at GVEC's current Delivery Charge, in addition to the applicable Generation and Transmission Charge, as specified under the Cooperative Tariff. 
    • GVEC is not responsible to the Member for any generation that does not occur for any reason.
    • Unless claimed by the Member, GVEC shall be permitted to claim and use any environmental attributes, including but not limited to Renewable Energy Credits.
  • The Member/Contractor agrees to pay a nonrefundable interconnection fee for interconnection processing.
Submission does not guarantee approval. This agreement may be declined or terminated if the Installation does not satisfy eligibility requirements, if the information you submit upon application is not accurate, or for any other reason.



*There is a 30MB file size limit. For larger files, please email the file to interconnection@GVEC.org.

*There is a 30MB file size limit. For larger files, please email the file to interconnection@GVEC.org.

*There is a 30MB file size limit. For larger files, please email the file to interconnection@GVEC.org.